Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0651 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,142 | $2,300 | n/a |
OK0651 # 04 Y:2002 | 04 | 2002 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $131,274 | $26,000 | n/a |
OK0651 # 05 Y:2002 | 05 | 2002 | INSTALL SET-BACK TIMERS | $10,697 | $1,416 | n/a |
OK0651 # 06 Y:2002 | 06 | 2002 | INSTALL OCCUPANCY SENSORS | $741 | $975 | n/a |
OK0651 # 07 Y:2002 | 07 | 2002 | IMPROVE SPACE COMFORT CONDITIONING | $37,907 | $36,300 | n/a |
OK0651 # 08 Y:2002 | 08 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,700 | $1,350 | n/a |
OK0651 # 09 Y:2002 | 09 | 2002 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $23,400 | $80,000 | n/a |
OK0651 # 10 Y:2002 | 10 | 2002 | IMPROVE SPACE COMFORT CONDITIONING | $46,800 | $2,500 | n/a |
OK0648 # 01 Y:2002 | 01 | 2002 | USE OPTIMUM THICKNESS INSULATION | $12,108 | $2,317 | Implemented |
OK0648 # 02 Y:2002 | 02 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $38,422 | $70,536 | Not Implemented |
OK0648 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,590 | $4,344 | Not Implemented |
OK0648 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,975 | $4,500 | Implemented |
OK0648 # 05 Y:2002 | 05 | 2002 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $6,955 | $22,000 | Not Implemented |
OK0648 # 06 Y:2002 | 06 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $59,232 | $12,200 | n/a |
OK0648 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,683 | $240 | Implemented |
OK0648 # 08 Y:2002 | 08 | 2002 | INSTALL OCCUPANCY SENSORS | $94 | $288 | Not Implemented |
OK0648 # 09 Y:2002 | 09 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $169,242 | $37,910 | n/a |
OK0648 # 10 Y:2002 | 10 | 2002 | COVER OPEN TANKS | $1,983 | $752 | Not Implemented |
OK0648 # 11 Y:2002 | 11 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,458 | $702 | Not Implemented |
OK0646 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,976 | $3,150 | Not Implemented |
OK0646 # 02 Y:2002 | 02 | 2002 | INSTALL SET-BACK TIMERS | $469 | $93 | Implemented |
OK0646 # 03 Y:2002 | 03 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $659 | $0 | Implemented |
OK0646 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $0 | Implemented |
OK0646 # 05 Y:2002 | 05 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $113 | $60 | Not Implemented |
OK0646 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $1,858 | $150 | Not Implemented |