Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0920 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,374 | $0 | Not Implemented |
UD0920 # 06 Y:2015 | 06 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $47,012 | $0 | Not Implemented |
UD0920 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,116 | $0 | Not Implemented |
UD0920 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,293 | $25,800 | Not Implemented |
UD0920 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,453 | $20,680 | Not Implemented |
UD0920 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,355 | $3,835 | Not Implemented |
UD0920 # 11 Y:2015 | 11 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,244 | $0 | Not Implemented |
UD0920 # 12 Y:2015 | 12 | 2015 | CONVERT TO AQUEOUS CLEANING SYSTEM | $6,095 | $7,375 | Implemented |
UM0454 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,028 | $2,000 | Not Implemented |
UM0454 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,291 | $14,700 | Not Implemented |
UM0454 # 03 Y:2015 | 03 | 2015 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,130 | $1,710 | Implemented |
UM0454 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $13,892 | $4,500 | Not Implemented |
UM0454 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,354 | $1,000 | Not Implemented |
UD0919 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,757 | $0 | Implemented |
UD0919 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,792 | $0 | Implemented |
UD0919 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,936 | $50 | Implemented |
UD0919 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,266 | $9,200 | Implemented |
UD0919 # 05 Y:2015 | 05 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,602 | $22,000 | Not Implemented |
UD0919 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,496 | $2,295 | Not Implemented |
UD0919 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,674 | $0 | Implemented |
UD0919 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,715 | $0 | Implemented |
UD0919 # 09 Y:2015 | 09 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,591 | $4,300 | Not Implemented |
UD0919 # 10 Y:2015 | 10 | 2015 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,652 | $5,000 | Not Implemented |
UD0919 # 11 Y:2015 | 11 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $242 | $700 | Not Implemented |
UD0919 # 12 Y:2015 | 12 | 2015 | MAKE A NEW BY-PRODUCT | $24,789 | $46,000 | Not Implemented |