IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0486 # 06 Y:2005 06 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,509 $700 Not Implemented
WI0486 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $671 $300 Not Implemented
WI0486 # 08 Y:2005 08 2005 INSTALL TIMERS AND/OR THERMOSTATS $453 $800 Implemented
WI0485 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,442 $32,548 Not Implemented
WI0485 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,838 $14,420 Implemented
WI0485 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,926 $3,443 Not Implemented
WI0485 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $3,641 $7,095 Implemented
WI0485 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,866 $1,720 Not Implemented
WI0485 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $842 $1,200 Not Implemented
WI0485 # 07 Y:2005 07 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $390 $800 Not Implemented
WI0485 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $354 $840 Not Implemented
IC0094 # 01 Y:2005 01 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,301 $54,519 Not Implemented
IC0094 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,962 $6,778 Not Implemented
IC0094 # 03 Y:2005 03 2005 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,437 $32,056 Implemented
IC0094 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,623 $3,900 Implemented
IC0094 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $992 $890 Not Implemented
IC0094 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Not Implemented
IC0094 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,655 $2,640 Not Implemented
IC0094 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,394 $5,123 Not Implemented
WI0484 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,843 $44,480 Not Implemented
WI0484 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $2,603 $3,060 Not Implemented
WI0484 # 03 Y:2005 03 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $14,141 $60,000 Not Implemented
WI0484 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,391 $5,500 Not Implemented
WI0484 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,240 $500 Not Implemented
WI0484 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,787 $400 Not Implemented