IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0271 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,060 $47,675 Implemented
ME0271 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,694 $11,058 Implemented
ME0271 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $150 Implemented
ME0271 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $1,580 Not Implemented
ME0271 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $366 $407 Implemented
ME0271 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $224 $100 Implemented
ME0271 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $8,700 $6,800 Not Implemented
ME0271 # 08 Y:1999 08 1999 USE OTHER METHODS FOR NEUTRALIZATION $6,000 $7,800 Not Implemented
ME0271 # 09 Y:1999 09 1999 METER WASTE WATER $1,684 $200 Implemented
AR0166 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $6,552 Implemented
AR0166 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $20,587 $16,587 Implemented
AR0166 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $23,676 $38,630 Implemented
AR0166 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,702 $4,980 Implemented
AR0166 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,110 $201 Not Implemented
AR0166 # 06 Y:1999 06 1999 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $11,974 $0 Not Implemented
AR0166 # 07 Y:1999 07 1999 USE A RAG RECYCLE SERVICE $35,201 $0 Not Implemented
AR0166 # 08 Y:1999 08 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $78,658 $7,500 Not Implemented
MA0444 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,858 $0 Implemented
MA0444 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $303 $117 Implemented
MA0444 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $322 $248 Implemented
MA0444 # 04 Y:1999 04 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $879 $4,225 Not Implemented
MA0444 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $114 $470 Not Implemented
MA0444 # 06 Y:1999 06 1999 MODIFY STARTUP/SHUTDOWN TIMES $3,766 $0 Not Implemented
UM0146 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,736 $220 Not Implemented
UM0146 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $78 $200 Not Implemented