IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0011 # 06 Y:2001 06 2001 MODIFY WORKLOAD $128,000 $55,800 Implemented
LL0114 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $745 $0 Implemented
LL0114 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,623 $4,047 Not Implemented
LL0114 # 03 Y:2001 03 2001 USE PHOTOCELL CONTROLS $1,539 $162 Implemented
LL0114 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $628 $780 Implemented
LL0114 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,759 $2,340 Implemented
LL0114 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,625 $0 Implemented
UD0627 # 01 Y:2001 01 2001 REDUCE SCRAP PRODUCTION $47,250 $1,050 n/a
UD0627 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,010 $101,000 n/a
UD0627 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $13,365 $1,540 n/a
UD0627 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,787 $0 n/a
UD0627 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,552 $430 n/a
UD0627 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,378 $7,000 n/a
UD0627 # 07 Y:2001 07 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,215 $4,790 n/a
UD0627 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $0 n/a
UD0627 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $1,473 n/a
UD0627 # 10 Y:2001 10 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $251 $722 n/a
UD0627 # 11 Y:2001 11 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $151 $161 n/a
WI0402 # 01 Y:2001 01 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $44,317 $130,000 Not Implemented
WI0402 # 02 Y:2001 02 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,517 $55,500 Not Implemented
WI0402 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,905 $8,955 Implemented
WI0402 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,782 $19,554 n/a
WI0402 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,007 $15,230 Not Implemented
WI0402 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $3,649 $12,800 Not Implemented
WI0402 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $3,311 $618 Not Implemented