IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0347 # 08 Y:2004 08 2004 ADD AREA LIGHTING SWITCHES $1,051 $3,395 Not Implemented
UF0347 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,746 $800 Not Implemented
LL0199 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $33,535 $960 Implemented
LL0199 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $25,020 $2,910 Implemented
LL0199 # 03 Y:2004 03 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $13,735 $304 Implemented
LL0199 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $4,382 $24,514 Not Implemented
LL0199 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,985 $720 Implemented
LL0199 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $935 $525 Implemented
LL0199 # 07 Y:2004 07 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $544 $585 Implemented
LL0199 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $292 $120 Implemented
LL0199 # 09 Y:2004 09 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $41,244 $0 Implemented
LL0199 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,740 $5,697 Implemented
OR0460 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,500 Implemented
OR0460 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,070 $1,830 Implemented
OR0460 # 03 Y:2004 03 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $16,000 $0 Implemented
OR0460 # 04 Y:2004 04 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $37,500 $14,200 Not Implemented
OR0460 # 05 Y:2004 05 2004 MOVE PRODUCT USING MECHANICAL MEANS $7,850 $2,320 Implemented
MS0255 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,124 $23,073 Not Implemented
MS0255 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,517 $2,756 Not Implemented
MS0255 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,202 $372 Not Implemented
MS0255 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,343 $2,164 Not Implemented
MS0255 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,775 $4,524 Not Implemented
MS0255 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,953 $8,984 Not Implemented
MS0255 # 07 Y:2004 07 2004 AIR CONDITION ONLY SPACE NECESSARY $1,768 $600 Not Implemented
MS0255 # 08 Y:2004 08 2004 COMBINE UTILITY METERS $174 $50 Not Implemented