Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0529 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $360 | Implemented |
AM0529 # 07 Y:2007 | 07 | 2007 | USE SYNTHETIC LUBRICANT | $2,027 | $0 | Not Implemented |
AM0529 # 08 Y:2007 | 08 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $968 | $0 | Implemented |
UF0398 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,081 | $134,669 | Not Implemented |
UF0398 # 02 Y:2007 | 02 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $940 | $0 | Not Implemented |
UF0398 # 03 Y:2007 | 03 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $477 | $150 | Not Implemented |
UF0398 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $806 | $118 | Not Implemented |
UF0398 # 05 Y:2007 | 05 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $4,676 | $218 | Not Implemented |
UF0398 # 06 Y:2007 | 06 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,060 | $1,600 | Not Implemented |
UF0398 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM THICKNESS INSULATION | $32,078 | $6,105 | Not Implemented |
UF0398 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $547 | $0 | Not Implemented |
UF0398 # 09 Y:2007 | 09 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,769 | $19,429 | Not Implemented |
UF0398 # 10 Y:2007 | 10 | 2007 | OPTIMIZE PLANT POWER FACTOR | $209,563 | $17,000 | Not Implemented |
MI0146 # 01 Y:2007 | 01 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $127,674 | $105,070 | Not Implemented |
MI0146 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,375 | $30 | Implemented |
MI0146 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,482 | $1,074 | Implemented |
MI0146 # 04 Y:2007 | 04 | 2007 | HEAT WATER WITH EXHAUST HEAT | $14,461 | $1,349 | Implemented |
MI0146 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,799 | $14,700 | Not Implemented |
MI0146 # 06 Y:2007 | 06 | 2007 | USE PHOTOCELL CONTROLS | $6,838 | $770 | Not Implemented |
MI0146 # 07 Y:2007 | 07 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,866 | $2,373 | Not Implemented |
MI0146 # 08 Y:2007 | 08 | 2007 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,920 | $4,160 | Not Implemented |
NC0360 # 01 Y:2007 | 01 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $20,317 | $10,000 | Implemented |
NC0360 # 02 Y:2007 | 02 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $9,594 | $2,250 | Implemented |
NC0360 # 03 Y:2007 | 03 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $35,946 | $33,785 | Not Implemented |
NC0360 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,267 | $0 | Implemented |