IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0222 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,232 $92,405 Implemented
UA0222 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $12,593 $6,955 Not Implemented
UA0222 # 03 Y:2020 03 2020 COMBINE UTILITY METERS $26,371 $60,000 Not Implemented
UA0222 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,527 $7,775 Implemented
UA0222 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,178 $50 Not Implemented
UA0222 # 06 Y:2020 06 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,556 $500 Not Implemented
SD0591 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,538 $12,557 Not Implemented
SD0591 # 02 Y:2020 02 2020 USE PHOTOCELL CONTROLS $4,341 $4,995 Not Implemented
SD0591 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,858 $13,600 Not Implemented
SD0591 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,520 $11,623 Not Implemented
SD0591 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,043 $900 Not Implemented
SD0591 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,377 $45 Not Implemented
SD0591 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,259 $75 Implemented
UD1013 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,208 $0 Implemented
UD1013 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $75,593 $7,810 Not Implemented
UD1013 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $9,464 $1,012 Not Implemented
UD1013 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $768 $203 Not Implemented
UD1013 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,951 $5,000 Implemented
UD1013 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,346 $1,000 Implemented
UD1013 # 07 Y:2020 07 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $792 $600 Not Implemented
UD1013 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,239 $14,500 Implemented
UD1013 # 09 Y:2020 09 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,053 $1,800 Not Implemented
UD1013 # 10 Y:2020 10 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,681 $21,000 Not Implemented
UF0545 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67,090 $20,230 Implemented
UF0545 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,046 $88,272 Implemented