Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0748 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $303 | $108 | Implemented |
UD0747 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $182,400 | $85,000 | Not Implemented |
UD0747 # 02 Y:2006 | 02 | 2006 | DEVELOP STANDARD OPERATING PROCEDURES | $29,600 | $32,000 | Implemented |
UD0747 # 03 Y:2006 | 03 | 2006 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $23,000 | $1,200 | Not Implemented |
UD0747 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,997 | $22,960 | Not Implemented |
UD0747 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,322 | $14,256 | Implemented |
UD0747 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM THICKNESS INSULATION | $4,800 | $9,030 | Not Implemented |
UD0747 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $3,215 | $1,995 | Not Implemented |
UD0747 # 08 Y:2006 | 08 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $3,095 | $760 | Not Implemented |
UD0747 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,678 | $0 | Not Implemented |
UD0747 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,554 | $4,920 | Not Implemented |
UD0747 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,209 | $1,800 | Not Implemented |
UD0747 # 12 Y:2006 | 12 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $920 | $0 | Not Implemented |
UD0747 # 13 Y:2006 | 13 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $909 | $1,000 | Not Implemented |
UD0747 # 14 Y:2006 | 14 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $480 | $81 | Not Implemented |
BD0311 # 01 Y:2006 | 01 | 2006 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $135,621 | $15,000 | Not Implemented |
BD0311 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,869 | $19,000 | Not Implemented |
BD0311 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,440 | $51,950 | Not Implemented |
BD0311 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,646 | $0 | Not Implemented |
BD0311 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,867 | $10,230 | Not Implemented |
BD0311 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $543 | $375 | Not Implemented |
BD0311 # 07 Y:2006 | 07 | 2006 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $6,600 | $610 | Not Implemented |
BD0311 # 08 Y:2006 | 08 | 2006 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,860 | $8,000 | Not Implemented |
BD0311 # 09 Y:2006 | 09 | 2006 | MINIMIZE WATER USAGE | $656 | $3,220 | Not Implemented |
IC0115 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,445 | $26,134 | Implemented |