Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0294 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,067 | $0 | Implemented |
SU0294 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,276 | $0 | Implemented |
SU0294 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,995 | $1,245 | Not Implemented |
SU0294 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,763 | $1,440 | Implemented |
SU0294 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $492 | Implemented |
SU0294 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $142 | $817 | Implemented |
SU0294 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $1,808 | $9,734 | Not Implemented |
SU0294 # 08 Y:2010 | 08 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,680 | $17,732 | Not Implemented |
SU0294 # 09 Y:2010 | 09 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $108 | $516 | Not Implemented |
SU0294 # 10 Y:2010 | 10 | 2010 | UPGRADE OBSOLETE EQUIPMENT | $276 | $1,831 | Implemented |
SU0292 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,577 | $0 | Not Implemented |
SU0292 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $4,309 | $46 | Implemented |
SU0292 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,292 | $962 | Implemented |
SU0292 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,754 | $5,714 | Not Implemented |
SU0292 # 05 Y:2010 | 05 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $274 | $560 | Not Implemented |
SU0292 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,377 | $81,156 | Not Implemented |
SU0292 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $57,316 | $175,000 | Not Implemented |
SU0292 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $12,124 | $37,200 | Not Implemented |
SU0292 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,849 | $24,883 | Not Implemented |
SU0292 # 10 Y:2010 | 10 | 2010 | MOVE BOILER TO MORE EFFICIENT LOCATION | $6,648 | $60,575 | Not Implemented |
SU0290 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,822 | $0 | Implemented |
SU0290 # 02 Y:2010 | 02 | 2010 | DISCONNECT BALLASTS | $2,268 | $0 | Implemented |
SU0290 # 03 Y:2010 | 03 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,483 | $0 | Not Implemented |
SU0290 # 04 Y:2010 | 04 | 2010 | USE SYNTHETIC LUBRICANT | $190 | $0 | Not Implemented |
SU0290 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,690 | $200 | Implemented |