IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0309 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,494 $40 Implemented
LE0309 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,018 $2,431 Implemented
LE0307 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,369 $20,000 Not Implemented
LE0307 # 02 Y:2010 02 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,231 $30,000 Not Implemented
LE0307 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $15,010 $125 Implemented
LE0307 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,218 $47,450 Not Implemented
LE0307 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,286 $800 Implemented
LE0306 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $75,618 $68,000 Not Implemented
LE0306 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,392 $12,700 Not Implemented
LE0306 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,691 $10,000 Not Implemented
LE0306 # 04 Y:2010 04 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,549 $1,800 Not Implemented
DL0061 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $4,400 $100 Not Implemented
DL0061 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $100 Not Implemented
DL0061 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $655 $5,000 Implemented
DL0061 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,400 $5,200 Not Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 07 Y:2010 07 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,800 $2,400 Not Implemented
DL0061 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $246 $400 Not Implemented
DL0061 # 09 Y:2010 09 2010 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $438 $1,100 Not Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 11 Y:2010 11 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,440 $13,400 Not Implemented
DL0061 # 12 Y:2010 12 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,550 Not Implemented
DL0061 # 13 Y:2010 13 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $860 $8,000 Not Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented