Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0151 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,157 | $1,000 | Not Implemented |
UU0151 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $1,973 | $7,800 | Not Implemented |
UU0151 # 07 Y:2019 | 07 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,760 | $100 | Not Implemented |
WV0577 # 01 Y:2019 | 01 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $20,384 | $16,000 | Not Implemented |
WV0577 # 02 Y:2019 | 02 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,817 | $1,000 | Implemented |
WV0577 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,672 | $25,000 | Not Implemented |
WV0577 # 04 Y:2019 | 04 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $9,446 | $1,823 | Implemented |
WV0577 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,439 | $0 | Implemented |
WV0577 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,313 | $5,306 | Implemented |
WV0577 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,553 | $24,100 | Not Implemented |
WV0577 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,256 | $0 | Implemented |
WV0577 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $931 | $1,400 | Not Implemented |
MZ0269 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,409 | $250 | Implemented |
MZ0269 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $6,600 | Implemented |
MZ0269 # 03 Y:2019 | 03 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $17,310 | $10,400 | Not Implemented |
TR0012 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $5,267 | $1,049 | Implemented |
TR0012 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,120 | $5,616 | Implemented |
TR0012 # 03 Y:2019 | 03 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,664 | $6,310 | Implemented |
TR0012 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $230 | $296 | Implemented |
IP0118 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,954 | $824 | Implemented |
IP0118 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,154 | $1,526 | Implemented |
IP0118 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,045 | $2,439 | Not Implemented |
IP0118 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,021 | $10,215 | Implemented |
AM0781 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,349 | $43 | Not Implemented |
AM0781 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,054 | $17,860 | Not Implemented |