IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 Implemented
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 Implemented
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 Implemented
TT0296 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $41,037 $32,500 Not Implemented
TT0296 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,078 $4,500 Not Implemented
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 Implemented
TT0296 # 10 Y:2023 10 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $203,680 $300,000 Not Implemented
TT0296 # 11 Y:2023 11 2023 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,853 $7,500 Not Implemented
UL2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,408 $2,832 Implemented
UL2301 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $5,141 $9,184 Not Implemented
UL2301 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,531 $260,163 Not Implemented
UL2301 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,944 $0 Not Implemented
UL2301 # 05 Y:2023 05 2023 ADOPT IN-HOUSE MATERIAL GENERATION $85,200 $50,198 Not Implemented
UL2304 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,568 $26,328 Implemented
UL2304 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $294,679 $268,088 Not Implemented
UL2304 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,148 $36,675 Not Implemented
UL2304 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,501 $89,882 Not Implemented
UL2304 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,246 $1,300 Implemented
UL2304 # 06 Y:2023 06 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $84,650 $36,445 Not Implemented
UL2304 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,731 $40,000 Not Implemented
UL2303 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $43,641 $26,163 Not Implemented
UL2303 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,504 $0 Not Implemented
UL2303 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,439 $34,126 Not Implemented
UL2303 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,140 $7,650 Not Implemented
UL2303 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $36,831 $336,395 Not Implemented