IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0395 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $5,430 $11,800 Not Implemented
AM0395 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $580 Implemented
AM0395 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,180 $1,140 Implemented
AM0395 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,080 $100 Implemented
AM0395 # 06 Y:2001 06 2001 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $710 $703 Not Implemented
AM0395 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $870 $445 Implemented
AM0395 # 08 Y:2001 08 2001 KEEP LAMPS AND REFLECTORS CLEAN $270 $750 Implemented
TA0003 # 01 Y:2001 01 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,177 $2,016 Implemented
TA0003 # 02 Y:2001 02 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,272 $0 Implemented
TA0003 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $1,049 Not Implemented
TA0003 # 04 Y:2001 04 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,110 $0 Implemented
TA0003 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,912 $4,110 n/a
TA0003 # 06 Y:2001 06 2001 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,195 $12,855 Not Implemented
TA0003 # 07 Y:2001 07 2001 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $838 $624 Implemented
TA0003 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $470 $175 Not Implemented
TA0003 # 09 Y:2001 09 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $288 $0 Not Implemented
AM0394 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,625 $1,250 Implemented
AM0394 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $4,760 $4,500 Not Implemented
AM0394 # 03 Y:2001 03 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $4,480 $7,000 Implemented
AM0394 # 04 Y:2001 04 2001 INSTALL SKYLIGHTS $3,400 $9,860 Not Implemented
AM0394 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,340 $5,705 Implemented
AM0394 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $2,450 $4,330 Not Implemented
AM0394 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,300 $0 Implemented
AM0394 # 08 Y:2001 08 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,280 $0 Implemented
AM0394 # 09 Y:2001 09 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,640 $240 Not Implemented