IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0894 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,426 $0 Not Implemented
UD0894 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $142 $350 Implemented
UD0894 # 08 Y:2013 08 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $12,240 $30,550 Not Implemented
UD0894 # 09 Y:2013 09 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,400 $40,600 Not Implemented
WM0036 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $288 $0 Implemented
WM0036 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $396 $200 Not Implemented
WM0036 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $783 $4,255 Not Implemented
WM0036 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,540 $5,355 Not Implemented
WM0036 # 05 Y:2013 05 2013 IMPROVE SPACE COMFORT CONDITIONING $3,641 $595 Not Implemented
WM0036 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,574 $780 Not Implemented
WM0036 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,340 $1,900 Implemented
AM0646 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,500 $242,900 Not Implemented
AM0646 # 02 Y:2013 02 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $42,430 $14,500 Not Implemented
AM0646 # 03 Y:2013 03 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,300 $300 Not Implemented
AM0646 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,470 $2,800 Not Implemented
AM0646 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $2,250 Implemented
AM0646 # 06 Y:2013 06 2013 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $2,505 $5,010 Not Implemented
AM0646 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,850 $500 Implemented
AM0646 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,470 $770 Implemented
AM0646 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,385 $0 Implemented
AM0646 # 10 Y:2013 10 2013 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $440 $0 Implemented
AM0646 # 11 Y:2013 11 2013 USE SYNTHETIC LUBRICANT $215 $0 Implemented
UM0436 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,924 $2,500 Implemented
UM0436 # 02 Y:2013 02 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $24,443 $12,800 Not Implemented
UD0893 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $711 $0 Implemented