IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0649 # 05 Y:2002 05 2002 $397,966 $600,000 Not Implemented
OK0642 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,760 $9,780 Implemented
OK0642 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $900 Implemented
OK0642 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,265 $10 Implemented
OK0642 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $15,836 Not Implemented
OK0642 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $711 $450 Not Implemented
OK0642 # 06 Y:2002 06 2002 INSTALL SET-BACK TIMERS $2,130 $332 Implemented
OK0642 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $446 $0 Implemented
OK0642 # 08 Y:2002 08 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $245,550 $11,639 Not Implemented
OK0642 # 09 Y:2002 09 2002 MODIFY WORKLOAD $35,955 $0 Not Implemented
OK0640 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,949 $690 n/a
OK0640 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $8,851 $996 n/a
OK0640 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,022 $214 n/a
OK0640 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $583 $225 n/a
OK0641 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,032 $32,834 n/a
OK0641 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $1,658 $238 Not Implemented
OK0641 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $64,800 n/a
OK0641 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,661 $8,000 n/a
OK0641 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $265 $350 Not Implemented
OK0641 # 06 Y:2002 06 2002 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $47,600 $71,935 n/a
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
OK0639 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,500 $0 Implemented
OK0639 # 02 Y:2002 02 2002 IMPROVE SPACE COMFORT CONDITIONING $42,500 $3,150 Not Implemented
OK0639 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $258 $717 Implemented
OK0639 # 04 Y:2002 04 2002 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,338 $4,126 Not Implemented