IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0064 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $3,200 Implemented
TT0064 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,844 $29,100 Implemented
TT0064 # 06 Y:2011 06 2011 OPTIMIZE PLANT POWER FACTOR $7,300 $8,500 Implemented
TT0064 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $37,600 $5,500 Implemented
TT0064 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,800 $5,000 Implemented
IC0181 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $29 Implemented
IC0181 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $402 Implemented
IC0181 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,167 $1,700 Implemented
IC0181 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
IC0181 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $4,830 Implemented
IC0181 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $717 $2,886 Implemented
IC0181 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $600 Implemented
IC0181 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,382 $0 Implemented
IC0181 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,634 $100 Not Implemented
IC0181 # 10 Y:2011 10 2011 REPAIR OR REPLACE STEAM TRAPS $7,948 $1,458 Implemented
IC0181 # 11 Y:2011 11 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,962 $4,127 Implemented
IC0181 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $282 $479 Not Implemented
IC0181 # 13 Y:2011 13 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $33 $0 Implemented
IC0181 # 14 Y:2011 14 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $522 $0 Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 04 Y:2011 04 2011 USE MINIMUM SAFE OVEN VENTILATION $2,775 $6,150 Not Implemented
MA0670 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $523 $1,000 Not Implemented
LL0348 # 01 Y:2011 01 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $102,711 $10,348 Implemented