IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0339 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,354 $70,000 Not Implemented
LE0339 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,280 $1,000 Implemented
LE0339 # 08 Y:2012 08 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,007 $20,000 Not Implemented
LE0339 # 09 Y:2012 09 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,832 $20,000 Not Implemented
LE0339 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $13,433 $0 Implemented
LE0339 # 11 Y:2012 11 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $59,246 $10,500 Not Implemented
BS0003 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,118 $296 Implemented
BS0003 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,528 $300 Implemented
BS0003 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $4,997 Implemented
BS0003 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $1,497 Implemented
BS0003 # 05 Y:2012 05 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $458 $600 Implemented
BS0003 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $1,478 $500 Not Implemented
BS0003 # 07 Y:2012 07 2012 INSTALL TIMERS AND/OR THERMOSTATS $10,488 $570 Not Implemented
BS0003 # 08 Y:2012 08 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,937 $39,850 Not Implemented
CO0657 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,210 $77,390 Not Implemented
CO0657 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $350 Implemented
CO0657 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $460 $0 Implemented
CO0657 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $510 Not Implemented
CO0657 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $2,460 $35,000 Not Implemented
MZ0091 # 01 Y:2012 01 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $190,000 $5,000 Implemented
MZ0091 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,699 $0 Implemented
MZ0091 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,809 $27,800 Implemented
MZ0091 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,504 $0 Implemented
MZ0091 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,133 $0 Implemented
MZ0091 # 06 Y:2012 06 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,311 $9,516 Implemented