Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0339 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,354 | $70,000 | Not Implemented |
LE0339 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,280 | $1,000 | Implemented |
LE0339 # 08 Y:2012 | 08 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,007 | $20,000 | Not Implemented |
LE0339 # 09 Y:2012 | 09 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,832 | $20,000 | Not Implemented |
LE0339 # 10 Y:2012 | 10 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $13,433 | $0 | Implemented |
LE0339 # 11 Y:2012 | 11 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $59,246 | $10,500 | Not Implemented |
BS0003 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,118 | $296 | Implemented |
BS0003 # 02 Y:2012 | 02 | 2012 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,528 | $300 | Implemented |
BS0003 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,856 | $4,997 | Implemented |
BS0003 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $831 | $1,497 | Implemented |
BS0003 # 05 Y:2012 | 05 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $458 | $600 | Implemented |
BS0003 # 06 Y:2012 | 06 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $1,478 | $500 | Not Implemented |
BS0003 # 07 Y:2012 | 07 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $10,488 | $570 | Not Implemented |
BS0003 # 08 Y:2012 | 08 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,937 | $39,850 | Not Implemented |
CO0657 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,210 | $77,390 | Not Implemented |
CO0657 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,840 | $350 | Implemented |
CO0657 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $460 | $0 | Implemented |
CO0657 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $510 | Not Implemented |
CO0657 # 05 Y:2012 | 05 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,460 | $35,000 | Not Implemented |
MZ0091 # 01 Y:2012 | 01 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $190,000 | $5,000 | Implemented |
MZ0091 # 02 Y:2012 | 02 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,699 | $0 | Implemented |
MZ0091 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,809 | $27,800 | Implemented |
MZ0091 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,504 | $0 | Implemented |
MZ0091 # 05 Y:2012 | 05 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,133 | $0 | Implemented |
MZ0091 # 06 Y:2012 | 06 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $24,311 | $9,516 | Implemented |