IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0557 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $65,760 $117,200 Implemented
WV0557 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $43,281 $33,600 Implemented
WV0557 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $22,313 $25,000 Not Implemented
WV0557 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $13,930 $2,320 Implemented
WV0557 # 05 Y:2018 05 2018 UPGRADE CONTROLS ON COMPRESSORS $14,479 $27,450 Implemented
WV0557 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,808 $0 Not Implemented
WV0557 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $3,480 $16,000 Not Implemented
WV0557 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,390 $1,950 Not Implemented
WV0557 # 09 Y:2018 09 2018 MINIMIZE WATER USAGE $2,486 $5,600 Not Implemented
WV0557 # 10 Y:2018 10 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,424 $90 Not Implemented
WV0557 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,022 $1,365 Not Implemented
WV0557 # 12 Y:2018 12 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $508 $2,480 Implemented
OK0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $12,254 $1,350 Implemented
OK0980 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,443 $4,790 Not Implemented
OK0980 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $7,298 Not Implemented
OK0980 # 04 Y:2018 04 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,198 $23,580 Not Implemented
OK0980 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,343 $31,350 Not Implemented
OK0980 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $13,258 $16,892 Not Implemented
UA0191 # 01 Y:2018 01 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,889 $37,420 Not Implemented
UA0191 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $15,914 $0 Implemented
UA0191 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,060 $34,939 Not Implemented
UA0191 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,326 $2,165 Implemented
UA0191 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,391 $150 Not Implemented
UA0191 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,997 $0 Implemented
UA0191 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $489 $2,112 Not Implemented