IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0233 # 08 Y:1998 08 1998 APPLY FOR INVESTMENT INCENTIVES $704 $60 Not Implemented
AS0233 # 09 Y:1998 09 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $11,008 $1,480 Implemented
AS0233 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $96,975 $150,000 Implemented
AS0232 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $528 $750 Not Implemented
AS0232 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,829 $20,012 Implemented
AS0232 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $141,064 $100,000 Not Implemented
AS0232 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,577 $785 Implemented
AS0232 # 05 Y:1998 05 1998 UPGRADE CONVEYORS $3,611 $10,240 Not Implemented
AS0232 # 06 Y:1998 06 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,269 $9,500 Not Implemented
AS0232 # 07 Y:1998 07 1998 CLEAR AND RENT EXISTING SPACE $27,050 $3,600 Not Implemented
AS0232 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $300,000 $80,000 Not Implemented
AS0232 # 09 Y:1998 09 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,710 $46,000 Not Implemented
AS0231 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,912 $23,975 Implemented
AS0231 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $377 Not Implemented
AS0231 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $819 $822 Not Implemented
AS0231 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $613 $1,425 Implemented
AS0231 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,835 $11,600 Not Implemented
AS0231 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,005 $240 Not Implemented
AS0231 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $616 $60 Implemented
AS0231 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $525 $60 Not Implemented
AS0231 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $12,854 $450 Implemented
AS0231 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,919 $9,000 Not Implemented
AS0230 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $885 $60 Not Implemented
AS0230 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $385 $675 Not Implemented
AS0230 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,253 $2,300 Not Implemented