Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0692 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,465 | $500 | Not Implemented |
GT0692 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,500 | $170,000 | Not Implemented |
GT0692 # 06 Y:2000 | 06 | 2000 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $9,831 | $26,400 | Not Implemented |
GT0692 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,321 | $41,750 | Not Implemented |
GT0692 # 08 Y:2000 | 08 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,155 | $0 | Not Implemented |
GT0693 # 01 Y:2000 | 01 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $96,627 | $0 | Not Implemented |
GT0693 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,400 | $152,830 | Implemented |
GT0693 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,416 | $63,200 | Not Implemented |
GT0693 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,800 | $0 | Not Implemented |
GT0693 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,280 | $64,000 | Not Implemented |
GT0693 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,972 | $1,050 | Implemented |
GT0693 # 07 Y:2000 | 07 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $97,512 | $0 | Not Implemented |
GT0693 # 08 Y:2000 | 08 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $14,770 | $1,250 | Implemented |
GT0693 # 09 Y:2000 | 09 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $60,000 | $120,000 | Not Implemented |
GT0691 # 01 Y:2000 | 01 | 2000 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $16,970 | $35,000 | Not Implemented |
GT0691 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,567 | $56,336 | Implemented |
GT0691 # 03 Y:2000 | 03 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,350 | $324 | Not Implemented |
GT0691 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,915 | $29,000 | Not Implemented |
GT0691 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $8,289 | $2,400 | Implemented |
GT0691 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,271 | $19,000 | Not Implemented |
GT0691 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $26,306 | $7,850 | Implemented |
GT0691 # 08 Y:2000 | 08 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $39,645 | $60,000 | Not Implemented |
GT0691 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM TEMPERATURE | $94,400 | $0 | Not Implemented |
GT0690 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $878 | $635 | n/a |
GT0690 # 02 Y:2000 | 02 | 2000 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,244 | $525 | n/a |