IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0166 # 07 Y:1999 07 1999 USE A RAG RECYCLE SERVICE $35,201 $0 Not Implemented
AR0166 # 08 Y:1999 08 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $78,658 $7,500 Not Implemented
AR0164 # 01 Y:1999 01 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,789 $2,617 Implemented
AR0164 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $1,521 Implemented
AR0164 # 03 Y:1999 03 1999 REDUCE SCRAP PRODUCTION $21,233 $25,000 Not Implemented
AR0164 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $176,000 $24,000 Not Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $91,400 $49,760 Not Implemented
TN0661 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $73,031 $8,750 Not Implemented
TN0661 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $72,160 $93,000 Not Implemented
TN0661 # 05 Y:1999 05 1999 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $39,290 $2,720 Not Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented
TN0661 # 07 Y:1999 07 1999 METER WASTE WATER $13,500 $3,700 Not Implemented
TN0661 # 08 Y:1999 08 1999 INSTALL TIMERS AND/OR THERMOSTATS $6,500 $650 Not Implemented
TN0656 # 01 Y:1999 01 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $400,000 $618,000 Not Implemented
TN0656 # 02 Y:1999 02 1999 OPERATE BOILERS ON HIGH FIRE SETTING $175,220 $82,400 Implemented
TN0656 # 03 Y:1999 03 1999 MINIMIZE WATER USAGE $143,010 $60,900 Not Implemented
TN0656 # 04 Y:1999 04 1999 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $130,100 $137,500 Implemented
TN0656 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $22,000 $0 Implemented
TN0656 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $2,020 $3,560 Not Implemented
TN0656 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,800 $2,380 Not Implemented
AR0161 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $161 Not Implemented
AR0161 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $220 Implemented
AR0161 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $130 Implemented
AR0161 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $149 $377 Implemented