IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0269 # 01 Y:1996 01 1996 INSULATE BARE EQUIPMENT $703 $409 Implemented
OR0269 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,741 $6,752 Implemented
OR0269 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $1,640 $5,700 Implemented
OR0269 # 04 Y:1996 04 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $85,508 $330,000 Implemented
NC0099 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,822 $7,500 n/a
NC0099 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,237 $27,552 n/a
NC0099 # 03 Y:1996 03 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $201 $40 n/a
NC0099 # 04 Y:1996 04 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $289 $10 n/a
NC0099 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,927 $200 n/a
NC0099 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,592 $390 n/a
NC0099 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $1,600 n/a
NC0099 # 08 Y:1996 08 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,584 $66,000 n/a
NV0061 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,498 $-2,645 Not Implemented
NV0061 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $20,608 $2,945 Implemented
NV0061 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $731 $200 Implemented
NV0061 # 04 Y:1996 04 1996 $230,000 $40,000 Implemented
NC0082 # 01 Y:1996 01 1996 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,228 $2,500 Implemented
NC0082 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,084 $3,000 Not Implemented
NC0082 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $534 $330 Not Implemented
NC0082 # 04 Y:1996 04 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,118 $100 Implemented
NC0082 # 05 Y:1996 05 1996 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $820 $200 Implemented
NC0082 # 06 Y:1996 06 1996 REDUCE VENTILATION AIR $4,208 $10,000 Not Implemented
NC0082 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $91 $80 Not Implemented
NC0082 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $560 Not Implemented
NC0082 # 09 Y:1996 09 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $15,254 $1,350 Implemented