IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0130 # 03 Y:2006 03 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,791 $1,020 Implemented
MI0130 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,865 $1,074 Implemented
MI0130 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,043 $720 Not Implemented
MI0130 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,895 $3,800 Implemented
MI0130 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,650 $30 Not Implemented
OK0729 # 01 Y:2006 01 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,248 $15,150 Not Implemented
OK0729 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,516 $4,800 Not Implemented
OK0729 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,820 $3,090 Not Implemented
OK0729 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $18,960 Not Implemented
OK0729 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $3,244 Not Implemented
AM0512 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $48,200 $0 Implemented
AM0512 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,440 $0 Implemented
AM0512 # 03 Y:2006 03 2006 RECOVER AND REUSE WASTE MATERIAL $6,200 $9,135 Not Implemented
AM0512 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $0 Not Implemented
AM0512 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,965 $860 Implemented
AM0512 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
AM0512 # 07 Y:2006 07 2006 REUSE RAGS UNTIL COMPLETELY SOILED $1,300 $0 Not Implemented
AM0512 # 08 Y:2006 08 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $800 $0 Not Implemented
AM0512 # 09 Y:2006 09 2006 USE SYNTHETIC LUBRICANT $700 $0 Not Implemented
AM0512 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $0 Not Implemented
BD0311 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $135,621 $15,000 Not Implemented
BD0311 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,869 $19,000 Not Implemented
BD0311 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,440 $51,950 Not Implemented
BD0311 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,646 $0 Not Implemented
BD0311 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $10,230 Not Implemented