IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0354 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,132 $3,100 Not Implemented
BD0354 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $13,322 $2,000 Not Implemented
BD0354 # 08 Y:2009 08 2009 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $24,415 $0 Not Implemented
BD0353 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $5,244 Not Implemented
BD0353 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $302 $528 Not Implemented
BD0353 # 03 Y:2008 03 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $1,207 $30 Not Implemented
BD0353 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $225 Not Implemented
BD0353 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $437 $1,000 Not Implemented
BD0353 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,431 $200 Not Implemented
BD0353 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $4,341 $5,300 Not Implemented
BD0353 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,315 $3,150 Not Implemented
BD0353 # 09 Y:2008 09 2008 USE EVAPORATION TO CONCENTRATE MATERIAL $6,150 $7,400 Not Implemented
BD0351 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,834 $48,839 Not Implemented
BD0351 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,088 $2,250 Not Implemented
BD0351 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $412 $425 Not Implemented
BD0351 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,907 $1,500 Not Implemented
BD0351 # 05 Y:2008 05 2008 USE RADIANT HEATER FOR SPOT HEATING $62,988 $47,700 Not Implemented
BD0351 # 06 Y:2008 06 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $9,722 $25,200 Not Implemented
BD0351 # 07 Y:2008 07 2008 MODIFY STARTUP/SHUTDOWN TIMES $84,567 $63,000 Not Implemented
IC0152 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $4,809 $5,020 Not Implemented
IC0152 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,810 $2,300 Implemented
IC0152 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $218 $0 Not Implemented
IC0152 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,150 $1,080 Not Implemented
IC0152 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,037 $1,404 Not Implemented
IC0152 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $922 $2,977 Implemented