IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0137 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,412 $4,890 Not Implemented
BD0137 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,871 $0 Not Implemented
BD0137 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $225 Implemented
BD0137 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,559 $900 Not Implemented
BD0137 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $1,173 $600 Not Implemented
BD0137 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $969 Not Implemented
BD0137 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $500 Not Implemented
BD0137 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $380 Not Implemented
BD0137 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,707 $10,000 Implemented
BD0137 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $793 $1,540 Not Implemented
BD0137 # 11 Y:1999 11 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $11,480 $45,000 Not Implemented
CO0443 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $16,960 $0 Implemented
CO0443 # 02 Y:1999 02 1999 REDUCE VENTILATION AIR $11,050 $12,600 Not Implemented
CO0443 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,900 $250 Implemented
CO0443 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,760 $2,000 Implemented
CO0443 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,660 $530 Implemented
CO0443 # 06 Y:1999 06 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,210 $1,000 Implemented
CO0443 # 07 Y:1999 07 1999 BURN WASTE OIL FOR HEAT $17,150 $10,500 Not Implemented
CO0443 # 08 Y:1999 08 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $31,200 $8,000 Implemented
DS0145 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,985 $8 Implemented
DS0145 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,434 $462 Implemented
DS0145 # 03 Y:1999 03 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $15,332 $945 Not Implemented
ND0324 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $802 $1,525 Not Implemented
ND0324 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $250 Implemented
ND0324 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,258 $30,000 Implemented