IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0376 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,250 $0 Not Implemented
AM0376 # 05 Y:2000 05 2000 ADD AREA LIGHTING SWITCHES $950 $640 Implemented
AM0376 # 06 Y:2000 06 2000 USE PHOTOCELL CONTROLS $730 $605 Implemented
AM0376 # 07 Y:2000 07 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $700 $350 Implemented
AM0376 # 08 Y:2000 08 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $600 $1,030 Implemented
NC0188 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $440 Implemented
NC0188 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $1,623 Not Implemented
NC0188 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,067 $6,800 Not Implemented
NC0188 # 04 Y:2000 04 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,795 $1,500 Not Implemented
NC0188 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,106 $500 Implemented
NC0188 # 06 Y:2000 06 2000 INSTALL COMMON HEADER ON COMPRESSORS $15,323 $2,200 Not Implemented
NC0188 # 07 Y:2000 07 2000 BURN WOOD BY-PRODUCTS FOR HEAT $3,120 $0 Implemented
NC0188 # 08 Y:2000 08 2000 $26,287 $960 Not Implemented
MO0282 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,395 $15,233 Not Implemented
MO0282 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $987 $845 Not Implemented
MO0282 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $407 $122 Not Implemented
MO0282 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $40 Not Implemented
MO0282 # 05 Y:2000 05 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $338 $240 Not Implemented
MO0282 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $836 $0 Not Implemented
MO0282 # 07 Y:2000 07 2000 $4,380 $338 Not Implemented
MO0282 # 08 Y:2000 08 2000 $5,111 $1,400 Not Implemented
OR0366 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,963 $0 Implemented
OR0366 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $0 Implemented
OR0366 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $359 $1,200 Not Implemented
OR0366 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,570 $7,800 Not Implemented