Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0481 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,477 | $140 | Implemented |
SF0481 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,662 | $0 | Implemented |
SF0481 # 03 Y:2016 | 03 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,033 | $0 | Implemented |
SF0481 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,008 | $0 | Not Implemented |
SF0481 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $23,373 | $0 | Not Implemented |
SF0481 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $908 | $105 | Implemented |
SF0481 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,030 | $208 | Not Implemented |
SF0481 # 08 Y:2016 | 08 | 2016 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $119,304 | $36,151 | Not Implemented |
SF0481 # 09 Y:2016 | 09 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $48,481 | $18,682 | Implemented |
SF0481 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $660 | $769 | Implemented |
SF0481 # 11 Y:2016 | 11 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,601 | $10,000 | Not Implemented |
SF0481 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,674 | $10,567 | Not Implemented |
SF0481 # 13 Y:2016 | 13 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,905 | $11,333 | Not Implemented |
SD0532 # 01 Y:2016 | 01 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $872,947 | $2,778,600 | Not Implemented |
SD0532 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,280 | $13,575 | Not Implemented |
SD0532 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $40,203 | $13,575 | Not Implemented |
SD0532 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,093 | $1,200 | Not Implemented |
SD0532 # 05 Y:2016 | 05 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,383 | $14,410 | Not Implemented |
SD0532 # 06 Y:2016 | 06 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $2,528 | $1,000 | Not Implemented |
SD0541 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $51,914 | $30,240 | Not Implemented |
SD0541 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,692 | $1,454 | Implemented |
SD0541 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,995 | $4,078 | Implemented |
SD0541 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $976 | $324 | Implemented |
SD0541 # 05 Y:2016 | 05 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $13,025 | $17,000 | Implemented |
SD0541 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,362 | $200 | Not Implemented |