Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0270 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,344 | $160 | Implemented |
IA0270 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $949 | $120 | Implemented |
IA0270 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $651 | $1,176 | Implemented |
IA0270 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $0 | Not Implemented |
IA0270 # 07 Y:2001 | 07 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,084 | $91 | Not Implemented |
IA0270 # 08 Y:2001 | 08 | 2001 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $27,169 | $14,000 | Not Implemented |
IA0270 # 09 Y:2001 | 09 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $114,660 | $46 | Not Implemented |
IA0270 # 10 Y:2001 | 10 | 2001 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $58,301 | $3,701 | Not Implemented |
IC0010 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,637 | $8,900 | Implemented |
IC0010 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,908 | $245 | Not Implemented |
IC0010 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,511 | $4,312 | Implemented |
IC0010 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,703 | $21,377 | n/a |
IC0010 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $1,250 | Implemented |
IC0010 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,700 | $178,925 | n/a |
IC0010 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,000 | $9,500 | Implemented |
IC0010 # 08 Y:2001 | 08 | 2001 | MODIFY WORKLOAD | $208,000 | $57,400 | n/a |
UD0626 # 01 Y:2001 | 01 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $49,350 | $4,680 | Not Implemented |
UD0626 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,653 | $0 | Implemented |
UD0626 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,326 | $1,000 | Implemented |
UD0626 # 04 Y:2001 | 04 | 2001 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,451 | $112 | Implemented |
UD0626 # 05 Y:2001 | 05 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,173 | $364 | Implemented |
UD0626 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,158 | $1,050 | Implemented |
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |