Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0487 # 14 Y:2014 | 14 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,359 | $487 | Not Implemented |
WV0487 # 15 Y:2014 | 15 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $931 | $2,000 | Not Implemented |
WV0487 # 16 Y:2014 | 16 | 2014 | INSULATE BARE EQUIPMENT | $564 | $2,006 | Implemented |
WV0487 # 17 Y:2014 | 17 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $534 | $792 | Implemented |
DL0130 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,000 | $1,000 | Not Implemented |
DL0130 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,689 | $88,625 | Implemented |
DL0130 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $200 | Implemented |
DL0130 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,400 | $800 | Implemented |
DL0130 # 05 Y:2014 | 05 | 2014 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,400 | $8,400 | Implemented |
MZ0139 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $11,156 | $7,200 | Implemented |
MZ0139 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,028 | $38,640 | Implemented |
MZ0139 # 03 Y:2014 | 03 | 2014 | USE PHOTOCELL CONTROLS | $4,586 | $2,450 | Implemented |
MZ0139 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,499 | $0 | Not Implemented |
MZ0139 # 05 Y:2014 | 05 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,210 | $0 | Implemented |
MZ0139 # 06 Y:2014 | 06 | 2014 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $60,368 | $50,000 | Implemented |
MZ0139 # 07 Y:2014 | 07 | 2014 | CONDENSE OPERATION INTO ONE BUILDING | $16,179 | $85,000 | Implemented |
MZ0139 # 08 Y:2014 | 08 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,370 | $40,000 | Not Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |
OR0629 # 02 Y:2014 | 02 | 2014 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $37,863 | $38,930 | Not Implemented |
OR0629 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $58,681 | $3,764 | Implemented |
OR0629 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $523,306 | $3,403,664 | Implemented |
IP0025 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,805 | $0 | Not Implemented |
IP0025 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,161 | $0 | Not Implemented |
IP0025 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $471 | $0 | Not Implemented |
IP0025 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,545 | $0 | Not Implemented |