IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0487 # 14 Y:2014 14 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,359 $487 Not Implemented
WV0487 # 15 Y:2014 15 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $931 $2,000 Not Implemented
WV0487 # 16 Y:2014 16 2014 INSULATE BARE EQUIPMENT $564 $2,006 Implemented
WV0487 # 17 Y:2014 17 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $534 $792 Implemented
DL0130 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,000 $1,000 Not Implemented
DL0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,689 $88,625 Implemented
DL0130 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $200 Implemented
DL0130 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,400 $800 Implemented
DL0130 # 05 Y:2014 05 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,400 $8,400 Implemented
MZ0139 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $11,156 $7,200 Implemented
MZ0139 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,028 $38,640 Implemented
MZ0139 # 03 Y:2014 03 2014 USE PHOTOCELL CONTROLS $4,586 $2,450 Implemented
MZ0139 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,499 $0 Not Implemented
MZ0139 # 05 Y:2014 05 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,210 $0 Implemented
MZ0139 # 06 Y:2014 06 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $60,368 $50,000 Implemented
MZ0139 # 07 Y:2014 07 2014 CONDENSE OPERATION INTO ONE BUILDING $16,179 $85,000 Implemented
MZ0139 # 08 Y:2014 08 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,370 $40,000 Not Implemented
OR0629 # 01 Y:2014 01 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $37,907 $21,000 Implemented
OR0629 # 02 Y:2014 02 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,863 $38,930 Not Implemented
OR0629 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $58,681 $3,764 Implemented
OR0629 # 04 Y:2014 04 2014 REPLACE BOILER $523,306 $3,403,664 Implemented
IP0025 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,805 $0 Not Implemented
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented