IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0383 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $842 $200 Not Implemented
AS0383 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,498 $120 Not Implemented
AS0383 # 03 Y:2004 03 2004 $16,320 $40,000 Not Implemented
AS0383 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,878 $1,350 Not Implemented
AS0383 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $12,003 Not Implemented
AS0383 # 06 Y:2004 06 2004 COVER OPEN TANKS $4,988 $6,000 Not Implemented
AS0383 # 07 Y:2004 07 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $244 $600 Not Implemented
AS0383 # 08 Y:2004 08 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,942 $600 Not Implemented
AS0383 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $406 $367 Not Implemented
AS0383 # 10 Y:2004 10 2004 $577,735 $9,735 Not Implemented
LE0193 # 01 Y:2004 01 2004 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $192,339 $50,000 n/a
LE0193 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $105,726 $58,053 n/a
LE0193 # 03 Y:2004 03 2004 REPAIR OR REPLACE STEAM TRAPS $17,227 $492 Implemented
LE0193 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,446 $2,000 Implemented
LE0193 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,252 $10,720 Not Implemented
LE0193 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $11,953 $4,508 Implemented
LE0193 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,349 $3,768 Implemented
LE0193 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $150 Implemented
IC0083 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $31,787 $32,056 Not Implemented
IC0083 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,453 $2,048 Implemented
IC0083 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $508 Not Implemented
IC0083 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,166 $18,190 Not Implemented
LL0194 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $10,188 $1,430 Not Implemented
LL0194 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,957 $570 Implemented
LL0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,000 $2,360 Implemented