Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0025 # 01 Y:2009 | 01 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $52,500 | $78,750 | Not Implemented |
UW0025 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,361 | $17,335 | Not Implemented |
UW0025 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM TEMPERATURE | $13,200 | $19,800 | Implemented |
UW0025 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,986 | $6,091 | Implemented |
SU0279 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,367 | $0 | Implemented |
SU0279 # 02 Y:2009 | 02 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,002 | $0 | Implemented |
SU0279 # 03 Y:2009 | 03 | 2009 | USE SYNTHETIC LUBRICANT | $673 | $0 | Not Implemented |
SU0279 # 04 Y:2009 | 04 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $319 | $0 | Implemented |
SU0279 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,115 | $1,032 | Not Implemented |
SU0279 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,498 | $748 | Implemented |
SU0279 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $204 | $305 | Implemented |
SU0279 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,866 | $10,242 | Implemented |
SU0279 # 09 Y:2009 | 09 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $225 | $478 | Not Implemented |
SU0279 # 10 Y:2009 | 10 | 2009 | OPTIMIZE PLANT POWER FACTOR | $1,617 | $7,912 | Not Implemented |
TT0031 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $850 | Implemented |
TT0031 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,178 | $480 | Implemented |
TT0031 # 03 Y:2009 | 03 | 2009 | USE PHOTOCELL CONTROLS | $23,587 | $55,000 | Implemented |
TT0031 # 04 Y:2009 | 04 | 2009 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $10,527 | $36,300 | Not Implemented |
GT0860 # 01 Y:2009 | 01 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,513 | $6,050 | Implemented |
GT0860 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,661 | $1,000 | Implemented |
GT0860 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,730 | $1,000 | Implemented |
GT0860 # 04 Y:2009 | 04 | 2009 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,140 | $6,750 | Not Implemented |
GT0860 # 05 Y:2009 | 05 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,419 | $7,066 | Implemented |
GT0860 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,213 | $12,000 | Not Implemented |
GT0860 # 07 Y:2009 | 07 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,199 | $4,250 | Not Implemented |