IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,910

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0318 # 06 Y:2024 06 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,885 $12,180 n/a
TT0318 # 07 Y:2024 07 2024 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,912 $15,000 n/a
TT0318 # 08 Y:2024 08 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,783 $460 n/a
WV0665 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,272 $1,500 Implemented
WV0665 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,064 $3,296 Implemented
WV0665 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $3,763 $2,971 Implemented
WV0665 # 08 Y:2024 08 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,306 $1,070 Implemented
WV0665 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $2,096 $1,417 Implemented
WV0665 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $150 Implemented
WV0665 # 11 Y:2024 11 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,829 $9,140 Not Implemented
WV0665 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $375 Implemented
WV0665 # 01 Y:2024 01 2024 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $100,715 $390,000 Not Implemented
WV0665 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,926 $238,677 Not Implemented
WV0665 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $7,375 $13,475 Not Implemented
WV0665 # 04 Y:2024 04 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $7,315 $22,800 Not Implemented
UU0251 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,394 $100,000 Implemented
UU0251 # 02 Y:2024 02 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $27,500 $13,788 Implemented
UU0251 # 03 Y:2024 03 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $23,190 $1,500 Not Implemented
UU0251 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,830 $19,570 Not Implemented
UU0251 # 05 Y:2024 05 2024 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $8,918 $750 Implemented
UU0251 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,210 $6,486 Implemented
UU0251 # 07 Y:2024 07 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,290 $5,750 Not Implemented
UU0251 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $300 Not Implemented
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 Not Implemented
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 Not Implemented