Search recommendations based on selected criteria.
RESET

141,145

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
UD0017 # 03 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,526 $776
UD0017 # 02 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,596 $25,000
UD0017 # 01 Y:1982 USE OPTIMUM THICKNESS INSULATION $1,212 $0
UD0019 # 01 Y:1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $550 $150
UD0019 # 02 Y:1982 INSTALL WEATHER STRIPPING ON WINDOWS AND DOORS $3,596 $5,400
UD0020 # 03 Y:1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $138 $350
UD0020 # 01 Y:1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,824 $30,000
UD0020 # 02 Y:1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $430 $300
UD0021 # 03 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,366 $37,700
UD0021 # 02 Y:1982 INSTALL STORM WINDOWS AND DOORS $330 $314
UD0021 # 01 Y:1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,609 $576
UD0022 # 03 Y:1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $39,185 $33,000
UD0022 # 01 Y:1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $45
UD0022 # 02 Y:1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,497 $700
UD0023 # 03 Y:1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,266 $300
Back to Top