IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,725

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0160 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,127 $6,290 Not Implemented
GT0163 # 01 Y:1983 01 1983 REPAIR AND ELIMINATE STEAM LEAKS $11,800 $350 Not Implemented
GT0163 # 02 Y:1983 02 1983 RECOVER WASTE HEAT FROM EQUIPMENT $6,087 $12,013 Not Implemented
GT0163 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,946 $150 Not Implemented
GT0163 # 04 Y:1983 04 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,520 $0 Not Implemented
GT0163 # 05 Y:1983 05 1983 COVER OPEN TANKS $1,400 $150 Not Implemented
TN0164 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $5,000 Not Implemented
TN0164 # 02 Y:1983 02 1983 RECOVER WASTE HEAT FROM EQUIPMENT $1,612 $2,500 Not Implemented
TN0164 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $50 $200 Not Implemented
TN0164 # 04 Y:1983 04 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,500 $1,500 Not Implemented
TN0166 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,800 $21,000 Not Implemented
TN0166 # 02 Y:1983 02 1983 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,600 $25,000 Not Implemented
TN0166 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,450 $10,000 Not Implemented
TN0167 # 01 Y:1983 01 1983 REDUCE VENTILATION AIR $23,801 $11,000 Not Implemented
TN0167 # 02 Y:1983 02 1983 BURN WOOD BY-PRODUCTS FOR HEAT $250,513 $1,000,000 Not Implemented
TN0167 # 03 Y:1983 03 1983 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $30,929 $32,300 Not Implemented
TN0167 # 04 Y:1983 04 1983 REDUCE VENTILATION AIR $5,074 $18,612 Not Implemented
KU0068 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,263 $6,058 Implemented
KU0068 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,920 $6,931 Implemented
KU0068 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,647 $20,000 Implemented
KU0068 # 04 Y:1983 04 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,656 $149 Implemented
KU0068 # 05 Y:1983 05 1983 OPTIMIZE PLANT POWER FACTOR $3,507 $1,685 Implemented
KU0068 # 06 Y:1983 06 1983 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,291 $0 Not Implemented
KU0068 # 07 Y:1983 07 1983 REDUCE VENTILATION AIR $3,114 $0 Not Implemented
KU0068 # 08 Y:1983 08 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,464 $0 Not Implemented