Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0482 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,464 | $27,738 | Not Implemented |
SF0482 # 05 Y:2016 | 05 | 2016 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,989 | $4,000 | Not Implemented |
SF0482 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,686 | $8,251 | Not Implemented |
SF0482 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $4,739 | $14,109 | Implemented |
SD0529 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $55,828 | $139,240 | Not Implemented |
SD0529 # 02 Y:2016 | 02 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $41,516 | $13,343 | Not Implemented |
SD0529 # 03 Y:2016 | 03 | 2016 | ADOPT IN-HOUSE MATERIAL GENERATION | $9,790 | $15,235 | Not Implemented |
SD0529 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,076 | $29,064 | Not Implemented |
SD0529 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,155 | $5,524 | Not Implemented |
SD0529 # 06 Y:2016 | 06 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,558 | $760 | Not Implemented |
SD0529 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,189 | $1,000 | Not Implemented |
SD0529 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $883 | $2,510 | Not Implemented |
SD0529 # 09 Y:2016 | 09 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $629 | $344 | Not Implemented |
SD0529 # 10 Y:2016 | 10 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $362 | $200 | Not Implemented |
SD0529 # 11 Y:2016 | 11 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $280 | $767 | Not Implemented |
SD0528 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $117,397 | $321,940 | Not Implemented |
SD0528 # 02 Y:2016 | 02 | 2016 | REDUCE SCRAP PRODUCTION | $22,801 | $25,619 | Not Implemented |
SD0528 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,641 | $1,700 | Implemented |
SD0528 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,638 | $43,142 | Implemented |
SD0528 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $8,651 | $1,032 | Not Implemented |
SD0528 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,000 | $200 | Not Implemented |
SD0528 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,400 | $1,300 | Not Implemented |
SD0528 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,725 | $7,800 | Not Implemented |
SD0528 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,286 | $4,076 | Not Implemented |
SD0528 # 10 Y:2016 | 10 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $200 | Not Implemented |