Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,380
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0277 # 04 Y:1989 | 04 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,165 | $1,500 | Implemented |
UD0277 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $746 | $1,500 | Implemented |
UD0277 # 06 Y:1989 | 06 | 1989 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,464 | $5,850 | Implemented |
UD0278 # 01 Y:1989 | 01 | 1989 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,746 | $1,000 | Not Implemented |
UD0278 # 02 Y:1989 | 02 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,631 | $1,000 | Not Implemented |
UD0278 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $839 | $450 | Implemented |
UD0278 # 04 Y:1989 | 04 | 1989 | OPTIMIZE PLANT POWER FACTOR | $2,600 | $10,000 | Not Implemented |
UD0273 # 01 Y:1989 | 01 | 1989 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,249 | $300 | Implemented |
UD0273 # 02 Y:1989 | 02 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,466 | $0 | Not Implemented |
UD0273 # 03 Y:1989 | 03 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $799 | $500 | Not Implemented |
UD0273 # 04 Y:1989 | 04 | 1989 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $10,928 | $28,000 | Implemented |
UD0273 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,844 | $15,120 | Not Implemented |
UD0274 # 01 Y:1989 | 01 | 1989 | REDUCE VENTILATION AIR | $8,923 | $500 | Implemented |
UD0274 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $3,754 | $900 | Implemented |
UD0274 # 03 Y:1989 | 03 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,724 | $0 | Implemented |
UD0274 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,413 | $32,500 | Implemented |
UD0274 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $482 | $650 | Implemented |
UD0271 # 01 Y:1989 | 01 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,000 | $0 | Implemented |
UD0271 # 02 Y:1989 | 02 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,360 | $0 | Implemented |
UD0271 # 03 Y:1989 | 03 | 1989 | REDESIGN PROCESS | $62,230 | $10,000 | Implemented |
UD0271 # 04 Y:1989 | 04 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,591 | $500 | Implemented |
UD0271 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,761 | $27,100 | Implemented |
UD0272 # 01 Y:1989 | 01 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,742 | $75,000 | Not Implemented |
UD0272 # 02 Y:1989 | 02 | 1989 | INSTALL SET-BACK TIMERS | $2,010 | $0 | Implemented |
UD0272 # 03 Y:1989 | 03 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,495 | $278 | Implemented |