IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0277 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,165 $1,500 Implemented
UD0277 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $746 $1,500 Implemented
UD0277 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,464 $5,850 Implemented
UD0278 # 01 Y:1989 01 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,746 $1,000 Not Implemented
UD0278 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,631 $1,000 Not Implemented
UD0278 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $450 Implemented
UD0278 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $2,600 $10,000 Not Implemented
UD0273 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,249 $300 Implemented
UD0273 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,466 $0 Not Implemented
UD0273 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $799 $500 Not Implemented
UD0273 # 04 Y:1989 04 1989 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $10,928 $28,000 Implemented
UD0273 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,844 $15,120 Not Implemented
UD0274 # 01 Y:1989 01 1989 REDUCE VENTILATION AIR $8,923 $500 Implemented
UD0274 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,754 $900 Implemented
UD0274 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,724 $0 Implemented
UD0274 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,413 $32,500 Implemented
UD0274 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $650 Implemented
UD0271 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,000 $0 Implemented
UD0271 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,360 $0 Implemented
UD0271 # 03 Y:1989 03 1989 REDESIGN PROCESS $62,230 $10,000 Implemented
UD0271 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,591 $500 Implemented
UD0271 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,761 $27,100 Implemented
UD0272 # 01 Y:1989 01 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,742 $75,000 Not Implemented
UD0272 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $2,010 $0 Implemented
UD0272 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,495 $278 Implemented