IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0121 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $320 $738 Not Implemented
AR0121 # 08 Y:1997 08 1997 RECOVER AND REUSE COOLING WATER $2,438 $4,200 Implemented
AR0121 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,410 $0 Implemented
AR0121 # 10 Y:1997 10 1997 INSTALL MAGAZINES FOR TEMPORARY STORAGE $16,725 $12,600 Not Implemented
AR0121 # 11 Y:1997 11 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $30,333 $15,000 Not Implemented
WV0127 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $718 $807 Implemented
WV0127 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,628 $4,080 Implemented
WV0127 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $480 Implemented
WV0127 # 10 Y:1997 10 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $85,710 $80,000 Not Implemented
WV0127 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $200 Not Implemented
WV0127 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $538 $188 Not Implemented
WV0127 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $96,588 $16,000 Not Implemented
WV0127 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $0 Not Implemented
WV0127 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,644 $12,500 Not Implemented
WV0127 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $200 Implemented
NC0118 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,752 $690 Implemented
NC0118 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $803 $249 Not Implemented
NC0118 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,932 $2,000 Not Implemented
NC0118 # 04 Y:1997 04 1997 REDUCE VENTILATION AIR $3,671 $12,046 Not Implemented
NC0118 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,676 $0 Implemented
NC0118 # 06 Y:1997 06 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,960 $606 Not Implemented
NC0118 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $680 $500 Not Implemented
NC0118 # 08 Y:1997 08 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $8,290 $0 Not Implemented
NC0118 # 09 Y:1997 09 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $942,500 $1,200,000 Not Implemented
NC0118 # 10 Y:1997 10 1997 INSTALL BACK-UP EQUIPMENT $13,406 $21,000 Not Implemented