Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0442 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $2,640 | $650 | Implemented |
AM0442 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $710 | $1,200 | Implemented |
AM0442 # 10 Y:2003 | 10 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $200 | $50 | Implemented |
UM0236 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,379 | $700 | Not Implemented |
UM0236 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,424 | $2,000 | Not Implemented |
UM0236 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,861 | $2,500 | Implemented |
UM0236 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,209 | $500 | Not Implemented |
UM0236 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $1,777 | $2,400 | Not Implemented |
UM0236 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $5,018 | Not Implemented |
CO0526 # 01 Y:2003 | 01 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $21,790 | $37,580 | Implemented |
CO0526 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,240 | $33,710 | Implemented |
CO0526 # 03 Y:2003 | 03 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,350 | $1,640 | Not Implemented |
CO0526 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,180 | $3,150 | Implemented |
CO0526 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,602 | $5,670 | Implemented |
CO0526 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,060 | $580 | Not Implemented |
CO0526 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,398 | $6,640 | Not Implemented |
CO0526 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $980 | $3,300 | Implemented |
CO0526 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $320 | $586 | Not Implemented |
IC0062 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,452 | $6,197 | Not Implemented |
IC0062 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,779 | $14,546 | Implemented |
IC0062 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,105 | $0 | Implemented |
IC0062 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,560 | $5,280 | Implemented |
IC0062 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $45,681 | $10,200 | Implemented |
IC0062 # 06 Y:2003 | 06 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $20,526 | $21,542 | Implemented |
IC0062 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,470 | $28,470 | Implemented |