IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0447 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $17,983 $2,000 Not Implemented
NC0447 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $400 Implemented
NC0447 # 04 Y:2012 04 2012 INSULATE FEEDWATER TANK $339 $1,133 Not Implemented
NC0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,779 $84,121 Not Implemented
NC0447 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,190 $399 Not Implemented
MZ0085 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $820 Not Implemented
MZ0085 # 02 Y:2012 02 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $79,573 $6,500 Implemented
MZ0085 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $72,621 $8,500 Implemented
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
UM0402 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,600 $2,000 Not Implemented
UM0402 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,676 $4,000 Not Implemented
UM0402 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,391 $4,000 Not Implemented
UM0402 # 07 Y:2012 07 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $52,867 $2,000 Not Implemented
UM0402 # 08 Y:2012 08 2012 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $11,060 $15,000 Not Implemented
MZ0089 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,314 $1,810 Implemented
MZ0089 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,028 $0 Not Implemented
MZ0089 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,384 $8,860 Implemented
MZ0089 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,426 $1,160 Implemented
MZ0089 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,996 $10,000 Not Implemented
MZ0089 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $50,074 $11,000 Implemented
BS0002 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,803 $3,000 Not Implemented
BS0002 # 02 Y:2012 02 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $106 $320 Not Implemented
BS0002 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $484 $580 Not Implemented