IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0142 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,501 $0 Implemented
IC0142 # 11 Y:2008 11 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $5,429 Implemented
IC0142 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $711 $1,402 Implemented
IC0142 # 13 Y:2008 13 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,171 $0 Implemented
IC0142 # 14 Y:2008 14 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,835 $16,294 Not Implemented
IC0142 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,846 $11,800 Implemented
BD0349 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $8,788 $1,125 Implemented
BD0349 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,551 $96,150 Not Implemented
BD0349 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $0 Not Implemented
BD0349 # 04 Y:2008 04 2008 REPLACE BOILER $205,005 $110,000 Not Implemented
BD0349 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $87,545 $10,000 Not Implemented
BD0349 # 06 Y:2008 06 2008 INSTALL TURBULATORS $131,143 $8,000 Not Implemented
BD0349 # 07 Y:2008 07 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,022 $46,000 Not Implemented
BD0349 # 08 Y:2008 08 2008 MINIMIZE WATER USAGE $991 $2,300 Not Implemented
IC0141 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,325 $6,000 Not Implemented
IC0141 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,733 $24,016 Implemented
IC0141 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $23,283 $37,500 Not Implemented
IC0141 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,400 $0 Not Implemented
IC0141 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,800 $49,250 Implemented
IC0141 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $14,000 Implemented
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
IC0141 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $59,840 $25,152 Not Implemented
IC0141 # 10 Y:2008 10 2008 REPAIR OR REPLACE STEAM TRAPS $19,800 $17,250 Not Implemented
IC0141 # 11 Y:2008 11 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,748 $180,000 Not Implemented