Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0002 # 04 Y:2012 | 04 | 2012 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $6,492 | $5,600 | Not Implemented |
BS0002 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,906 | $14,400 | Not Implemented |
MZ0084 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,602 | $15,200 | Implemented |
MZ0084 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,756 | $3,500 | Implemented |
MZ0084 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,987 | $500 | Not Implemented |
MZ0084 # 04 Y:2012 | 04 | 2012 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,897 | $2,400 | Not Implemented |
MZ0084 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,831 | $37,520 | Not Implemented |
MZ0084 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,736 | $11,730 | Implemented |
MZ0084 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,142 | $1,000 | Not Implemented |
MZ0084 # 08 Y:2012 | 08 | 2012 | ELIMINATE/REDUCE AN OPERATION | $6,939 | $0 | Implemented |
MZ0084 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $1,483 | $2,500 | Implemented |
MZ0084 # 10 Y:2012 | 10 | 2012 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,918 | $1,770 | Implemented |
NC0450 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,614 | $21,400 | Implemented |
NC0450 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,614 | $9,225 | Not Implemented |
NC0450 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,109 | $100 | Implemented |
NC0450 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,655 | $98,739 | Implemented |
NC0450 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $973 | Implemented |
NC0450 # 06 Y:2012 | 06 | 2012 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $632 | $2,035 | Not Implemented |
NC0450 # 07 Y:2012 | 07 | 2012 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $113,534 | $25,000 | Implemented |
NC0450 # 08 Y:2012 | 08 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $105,000 | $40,000 | Implemented |
NC0450 # 09 Y:2012 | 09 | 2012 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $38,389 | $30,000 | Implemented |
NC0450 # 10 Y:2012 | 10 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $4,739 | $8,000 | Not Implemented |
MI0222 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $94,284 | $46,620 | Not Implemented |
MI0222 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,472 | $19,980 | Not Implemented |
MI0222 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,910 | $2,520 | Implemented |