IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0122 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,402 $40 Not Implemented
UL0119 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $40 Implemented
UL0119 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $529 Implemented
TN0544 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,501 $0 Implemented
TN0544 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,786 $2,600 Implemented
TN0544 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,169 $5,480 Implemented
TN0544 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,079 $314 Implemented
TN0544 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,905 $300 Implemented
UL0117 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $149 $25 Not Implemented
UL0117 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,441 $22,850 Not Implemented
UL0117 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $1,046 $808 Not Implemented
UL0117 # 04 Y:1995 04 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,593 $1,146 Not Implemented
UL0117 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,993 $2,077 Not Implemented
UL0117 # 06 Y:1995 06 1995 METER WASTE WATER $8,000 $1,000 Not Implemented
UL0117 # 07 Y:1995 07 1995 TREAT AND REUSE RINSE WATERS $70,000 $8,000 Not Implemented
UL0117 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,100 $5,000 Not Implemented
UL0117 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,660 $1,000 Not Implemented
UL0117 # 10 Y:1995 10 1995 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS $3,600 $5,000 Not Implemented
UL0116 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,596 $2,430 Not Implemented
UL0116 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $12,198 $4,420 Implemented
UL0116 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $314 $240 Not Implemented
UL0116 # 04 Y:1995 04 1995 RECOVER AND REUSE SPENT ACID BATHS $3,762 $8,875 Not Implemented
UL0116 # 05 Y:1995 05 1995 RECOVER AND REUSE SPENT ACID BATHS $3,031 $4,741 Not Implemented
UL0116 # 06 Y:1995 06 1995 RECYCLE WASTE INK AND CLEANUP SOLVENT $15,551 $7,335 Implemented
UL0116 # 07 Y:1995 07 1995 RECYCLE WASTE INK AND CLEANUP SOLVENT $13,800 $0 Implemented