Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0122 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,402 | $40 | Not Implemented |
UL0119 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,280 | $40 | Implemented |
UL0119 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $477 | $529 | Implemented |
TN0544 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,501 | $0 | Implemented |
TN0544 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,786 | $2,600 | Implemented |
TN0544 # 03 Y:1995 | 03 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,169 | $5,480 | Implemented |
TN0544 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,079 | $314 | Implemented |
TN0544 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,905 | $300 | Implemented |
UL0117 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $149 | $25 | Not Implemented |
UL0117 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,441 | $22,850 | Not Implemented |
UL0117 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $1,046 | $808 | Not Implemented |
UL0117 # 04 Y:1995 | 04 | 1995 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,593 | $1,146 | Not Implemented |
UL0117 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,993 | $2,077 | Not Implemented |
UL0117 # 06 Y:1995 | 06 | 1995 | METER WASTE WATER | $8,000 | $1,000 | Not Implemented |
UL0117 # 07 Y:1995 | 07 | 1995 | TREAT AND REUSE RINSE WATERS | $70,000 | $8,000 | Not Implemented |
UL0117 # 08 Y:1995 | 08 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,100 | $5,000 | Not Implemented |
UL0117 # 09 Y:1995 | 09 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,660 | $1,000 | Not Implemented |
UL0117 # 10 Y:1995 | 10 | 1995 | REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS | $3,600 | $5,000 | Not Implemented |
UL0116 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,596 | $2,430 | Not Implemented |
UL0116 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $12,198 | $4,420 | Implemented |
UL0116 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $314 | $240 | Not Implemented |
UL0116 # 04 Y:1995 | 04 | 1995 | RECOVER AND REUSE SPENT ACID BATHS | $3,762 | $8,875 | Not Implemented |
UL0116 # 05 Y:1995 | 05 | 1995 | RECOVER AND REUSE SPENT ACID BATHS | $3,031 | $4,741 | Not Implemented |
UL0116 # 06 Y:1995 | 06 | 1995 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $15,551 | $7,335 | Implemented |
UL0116 # 07 Y:1995 | 07 | 1995 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $13,800 | $0 | Implemented |