IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
WI0456 # 01 Y:2003 01 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,554 $25,000 Not Implemented
WI0456 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,687 $27,555 Not Implemented
WI0456 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $8,675 $2,014 Not Implemented
WI0456 # 04 Y:2003 04 2003 UTILIZE OUTSIDE CONTRACTING $5,139 $1,240 Not Implemented
WI0456 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,517 $1,605 Not Implemented
WI0456 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,657 $1,000 Not Implemented
WI0455 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,710 $2,500 Implemented
WI0455 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,503 $2,000 Not Implemented
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
WI0454 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,309 $61,875 Implemented
WI0454 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,002 $24,500 Not Implemented
WI0454 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $4,154 $10,500 Not Implemented
WI0454 # 04 Y:2003 04 2003 INSTALL SET-BACK TIMERS $4,115 $400 Implemented
WI0454 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,128 $1,980 Implemented
WI0454 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,192 $1,600 Implemented
WI0453 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $47,771 $18,500 Not Implemented