IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0009 # 11 Y:1994 11 1994 USE RADIANT HEATER FOR SPOT HEATING $8,161 $21,400 Implemented
WI0208 # 01 Y:1994 01 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,158 $0 Implemented
WI0208 # 02 Y:1994 02 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,821 $15,000 Not Implemented
WI0208 # 03 Y:1994 03 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,036 $20,412 Not Implemented
WI0208 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,198 $12,000 Not Implemented
WI0208 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $335 $329 Not Implemented
WI0208 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $820 Not Implemented
WI0208 # 07 Y:1994 07 1994 DISTILL CONTAMINATED SOLVENTS FOR REUSE $5,500 $12,000 Not Implemented
WV0039 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,256 $5,485 Implemented
WV0039 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $298 $0 Implemented
WV0039 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $77,346 $5,000 Implemented
WV0039 # 04 Y:1994 04 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,913 $8,987 Not Implemented
WV0039 # 05 Y:1994 05 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,600 $9,000 Not Implemented
WV0039 # 06 Y:1994 06 1994 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $47,244 $1,200 Not Implemented
WV0039 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $2,475 $480 Implemented
WV0039 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $2,225 $569 Implemented
WV0039 # 09 Y:1994 09 1994 INSTALL TIMERS AND/OR THERMOSTATS $95,384 $6,300 Implemented
WV0039 # 10 Y:1994 10 1994 USE OPTIMUM TEMPERATURE $15,702 $800 Implemented
WV0039 # 11 Y:1994 11 1994 USE SYNTHETIC LUBRICANT $3,588 $0 Not Implemented
GT0538 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,230 $2,500 Implemented
GT0538 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,850 $3,000 Not Implemented
GT0538 # 03 Y:1994 03 1994 USE SYNTHETIC LUBRICANT $14,510 $0 Not Implemented
GT0538 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,870 $3,250 Not Implemented
GT0538 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,740 $160,000 Not Implemented
GT0538 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,570 $18,880 Implemented