IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0366 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,553 $200 Not Implemented
SD0366 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,250 $160 Implemented
SD0366 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,172 $900 Not Implemented
SD0366 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $695 $0 Implemented
SD0366 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,771 $17,633 Not Implemented
SD0366 # 08 Y:2005 08 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,248 $10,000 Not Implemented
SD0366 # 09 Y:2005 09 2005 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $19,018 $24,500 Implemented
SD0366 # 10 Y:2005 10 2005 $98,038 $1,964 Implemented
SD0366 # 11 Y:2005 11 2005 $2,758 $3,500 Implemented
NC0315 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,232 $100,000 Implemented
NC0315 # 02 Y:2005 02 2005 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $12,466 $45,000 Implemented
NC0315 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,799 $10,000 Implemented
NC0315 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,731 $0 Implemented
NC0315 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $535 $0 Implemented
NC0315 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $100 Implemented
IC0103 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,792 $12,792 Not Implemented
IC0103 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $8,631 $4,680 Not Implemented
IC0103 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,344 $1,400 Not Implemented
IC0103 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,340 $300 Not Implemented
IC0103 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $240 $0 Not Implemented
IC0103 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,336 $941 Not Implemented
IC0103 # 07 Y:2005 07 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $330 $2,800 Not Implemented
IC0103 # 08 Y:2005 08 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $104 $256 Not Implemented
LE0213 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,825 $1,344 Implemented
LE0213 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $22,533 $6,000 Implemented