IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0422 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,550 $15,331 Not Implemented
UM0422 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,633 $500 Implemented
UM0422 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,593 $14,120 Implemented
UK1311 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $16,665 $200 Implemented
UK1311 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,284 $88,771 Implemented
UK1311 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,500 $5,600 Implemented
UK1311 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,278 $27,331 Implemented
UK1311 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,537 $1,340 Implemented
UK1311 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $2,760 $3,342 Not Implemented
WM0024 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $974 Not Implemented
WM0024 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $950 $550 Implemented
WM0024 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,156 $0 Implemented
WM0024 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $0 Implemented
WM0024 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $276 Not Implemented
WM0024 # 06 Y:2013 06 2013 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $827 $2,009 Implemented
OK0858 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $40,042 $20,360 Not Implemented
OK0858 # 02 Y:2013 02 2013 INSTALL SET-BACK TIMERS $1,493 $172 Not Implemented
OK0858 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,082 $19,800 Not Implemented
OK0858 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,338 Implemented
OK0858 # 05 Y:2013 05 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,018 $268,800 Not Implemented
OK0858 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,454 $63,252 Not Implemented
OK0858 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,717 $66,757 Not Implemented
OK0858 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $6,565 $3,020 Not Implemented
OK0858 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,791 $1,220 Not Implemented
OR0604 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,634 $500 Implemented