IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0266 # 04 Y:2004 04 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,182 $1,000 Not Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
UM0266 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,195 $603 Not Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,312 $3,500 Not Implemented
UM0266 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,400 $700 Not Implemented
UD0699 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,000 $204,300 Not Implemented
UD0699 # 02 Y:2004 02 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $85,223 $13,240 Not Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,114 $0 Not Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
UD0699 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $890 Not Implemented
IC0084 # 01 Y:2004 01 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $144,862 $13,907 Not Implemented
IC0084 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $105 $0 Implemented
IC0084 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $400 Implemented
IC0084 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,809 $585 Implemented
IC0084 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,612 $4,021 Not Implemented
IC0084 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $943 $582,998 Implemented