IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0290 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $100 Implemented
ND0290 # 04 Y:1997 04 1997 ELIMINATE OXYGEN LOSS $479 $20 Implemented
ND0290 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $452 $400 Not Implemented
ND0290 # 06 Y:1997 06 1997 INSTALL REPLACEMENT DOORS $355 $1,050 Implemented
ND0290 # 07 Y:1997 07 1997 $325 $0 Implemented
ND0290 # 08 Y:1997 08 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $303 $335 Implemented
ND0290 # 09 Y:1997 09 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $20 $0 Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
HO0161 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,635 $1,878 Not Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 04 Y:1997 04 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,370 $5,000 Not Implemented
HO0161 # 05 Y:1997 05 1997 $480 $100 Implemented
HO0161 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,130 $100 Not Implemented
HO0161 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $12,500 $2,000 Implemented
UD0522 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $6,975 Implemented
UD0522 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $2,000 Implemented
UD0522 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,104 $16,862 Implemented
UD0522 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,190 $7,500 Not Implemented
UD0522 # 05 Y:1997 05 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,129 $4,000 Implemented
UD0522 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,194 $10,000 Not Implemented
UD0522 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $3,644 $3,500 Not Implemented
UD0522 # 08 Y:1997 08 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $11,573 $5,000 Not Implemented
UD0523 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,683 $0 Implemented
UD0523 # 02 Y:1997 02 1997 REVISE RAW MATERIAL SPECS $203,890 $100,000 Implemented
UD0523 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,766 $4,000 Not Implemented