IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0227 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $10,644 $0 Not Implemented
UL0227 # 04 Y:1999 04 1999 MODIFY STARTUP/SHUTDOWN TIMES $318,710 $533,131 Not Implemented
UL0227 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,430 $1,799 Implemented
UM0144 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,661 $110 Implemented
UM0144 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $1,000 Implemented
UM0144 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $350 Implemented
UM0144 # 04 Y:1999 04 1999 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,837 $9,350 Not Implemented
UM0144 # 05 Y:1999 05 1999 USE OPTIMUM THICKNESS INSULATION $1,848 $2,100 Not Implemented
UM0144 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $29,091 $5,000 Implemented
UM0144 # 07 Y:1999 07 1999 INSTALL SYSTEM TO COLLECT SCRAP $7,680 $584 Implemented
UF0230 # 01 Y:1999 01 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,087 $50 Implemented
UF0230 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,142 $2,240 Not Implemented
UF0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,804 $8,987 Not Implemented
UF0230 # 04 Y:1999 04 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,916 $0 Not Implemented
UF0230 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $198 $280 Not Implemented
KU0520 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $5,880 $4,000 Not Implemented
KU0520 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $1,080 Not Implemented
KU0520 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $410 $670 Not Implemented
KU0520 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $250 Implemented
KU0520 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $350 Implemented
KU0520 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $3,440 $3,630 Implemented
KU0520 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,720 $8,000 Implemented
KU0520 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $4,320 $9,500 Not Implemented
SD0232 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $8,010 $11,160 Implemented
SD0232 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,708 $21,250 Implemented