Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0227 # 03 Y:1999 | 03 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $10,644 | $0 | Not Implemented |
UL0227 # 04 Y:1999 | 04 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $318,710 | $533,131 | Not Implemented |
UL0227 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,430 | $1,799 | Implemented |
UM0144 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,661 | $110 | Implemented |
UM0144 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $647 | $1,000 | Implemented |
UM0144 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $350 | Implemented |
UM0144 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,837 | $9,350 | Not Implemented |
UM0144 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,848 | $2,100 | Not Implemented |
UM0144 # 06 Y:1999 | 06 | 1999 | REDUCE SCRAP PRODUCTION | $29,091 | $5,000 | Implemented |
UM0144 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $7,680 | $584 | Implemented |
UF0230 # 01 Y:1999 | 01 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,087 | $50 | Implemented |
UF0230 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $1,142 | $2,240 | Not Implemented |
UF0230 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,804 | $8,987 | Not Implemented |
UF0230 # 04 Y:1999 | 04 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,916 | $0 | Not Implemented |
UF0230 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $198 | $280 | Not Implemented |
KU0520 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $5,880 | $4,000 | Not Implemented |
KU0520 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $1,080 | Not Implemented |
KU0520 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $410 | $670 | Not Implemented |
KU0520 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $250 | $250 | Implemented |
KU0520 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $210 | $350 | Implemented |
KU0520 # 06 Y:1999 | 06 | 1999 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $3,440 | $3,630 | Implemented |
KU0520 # 07 Y:1999 | 07 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,720 | $8,000 | Implemented |
KU0520 # 08 Y:1999 | 08 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $4,320 | $9,500 | Not Implemented |
SD0232 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,010 | $11,160 | Implemented |
SD0232 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,708 | $21,250 | Implemented |